Geotechnical Issues and Answers During Construction of the Trans-Alaska Pipeline

[+] Author and Article Information
Ulrich Luscher, Howard P. Thomas

Woodward-Clyde Consultants, San Francisco, Calif. 94111

J. Energy Resour. Technol 101(2), 128-133 (Jun 01, 1979) (6 pages) doi:10.1115/1.3446902 History: Received July 27, 1978; Revised March 01, 1979; Online August 19, 2010

Abstract

The Trans-Alaska Oil Pipeline completed in 1977 was an unprecedented construction project. Some of the most challenging problems faced were in the geotechnical field. In the format of issues and answers, this paper highlights the activities and decision-making functions of the field engineering organization which was developed. This organization was responsive to the identified need for field confirmation of geotechnical conditions during construction and for assurance of adequacy of as-built construction. Appropriate procedures and lines of communication were established to satisfy these needs.

Copyright © 1979 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In